Proposed Road Improvements

The proposed design plans show works include construction of kerb and gutter, drainage, and a kerbside shared path for pedestrians and cyclists. These works will greatly enhance pedestrian safety, with a shared facility for pedestrians and cyclists. The aim of these works is also to improve drainage conditions and quality, road user safety, and reduce maintenance costs along this public road.

Have your say in three ways.

Take a look at the plan of the proposal in the Document Library and comment by:

  • completing the form below
  • emailing hsc@hornsby.nsw.gov.au
  • writing to the General Manager, Hornsby Shire Council, PO Box 37, Hornsby 1630.

Exhibition closes: Monday, 19 December 2022.