What's happening?

The proposed design plans include construction of kerb and gutter, kerb side footpath, drainage and pavement improvements. There will also be some low level retaining wall construction works and tree planting.

The aim of these works are to improve drainage conditions, road user safety, and to reduce maintenance in this residential street.

Please note there have been some design changes since the initial concept plan (Revision A) circulated last year. Revision A can still be seen on Council’s Website.

Have your say by:

  • completing the form below
  • emailing hsc@hornsby.nsw.gov.au with the subject: Comments on Burns Road North Beecroft (F2021/00243)
  • writing to the General Manager, Hornsby Shire Council, PO Box 37, Hornsby 1630.

Exhibition closes: Friday, 2 September 2022.